3 Phase,33 KV 1800 KVAR( 150 KVAR X 12),FLC32A Double Star Capacitor Bank with 108 KVAR Reactor Testing Procedure in case of 1 no 40 A HT Fuse Burnt?

<p>We are having CT of75/1 Ampere,NCT20/1 Ampere with CAG14 relay,other than7SR11 Siemens make Relay for O/C,E/F,NPS.</p>

user-image
تم إضافة السؤال من قبل Himadri Roy , MANAGER ELECTRICAL , STEAG ENERGY SERVICES
تاريخ النشر: 2014/09/20
Krishnudu M.V
من قبل Krishnudu M.V , Sr. Manager , Owenscorning Saint Gobain

The phase current should go beyond 20A based on the above given details. If the 40A fuse has failed means may be there is failure in one of the capacitor bank or the inrush current is high. 

Thabet Almezwk
من قبل Thabet Almezwk , QC/QA Engineer , Alfanar Electrical system

question is not clear

sorry

muhammad iqbal
من قبل muhammad iqbal , Electrical Engineer , M C DEAN INC< USA

I would suggest you to follow ANSI/NETA standards Section7..1 thru7..3.2. This covers all the visual and electrical tests to be performed to determine the integrity of the Capacitor/Reactor. If you need I can provide in PDF format, this section. Simple tests are Discharge time and winding resistance plus Ohms values to be as per manufacturer specifications. In the absence of manufacturer specifications, we can follow NETA guide lines.