True or false:The performance indices Cost Performance Index(CPI) &Schedule Performance Index(SPI) should NOT be used alongside Critical Path Analysis?

user-image
تم إضافة السؤال من قبل Muhammad Hamid Munir PMP , Program Manager , Ericsson AB
تاريخ النشر: 2015/05/19
Wessam Ali
من قبل Wessam Ali , MEP Project Manager , British Petroleum

True. the critical path analysis is used during the planning phase of the project as a step of determining the time and cost of the project, while the performance indices (CPI and SPI ) are used to determine the project performance during the project monitoring and controlling and measured to the scope and cost baselines that determined in advance at project planning processes as a result of the critical path analysis. ETC, EAC, VAC and TCPI should be used alongside with performance indices. 

المزيد من الأسئلة المماثلة

هل تحتاج لمساعدة في كتابة سيرة ذاتية تحتوي على الكلمات الدلالية التي يبحث عنها أصحاب العمل؟