ابدأ بالتواصل مع الأشخاص وتبادل معارفك المهنية

أنشئ حسابًا أو سجّل الدخول للانضمام إلى مجتمعك المهني.

متابعة

The material master views MRP 1 to MRP 4 and the work scheduling are of particular interest in the manufacturing execution application of SAP ERP?

Which field determines that a material is subject to in-house production and in which view does this field reside? (1 correct answer)

A. MRP type in work scheduling view

B. MRP group in MRP2 view

C. Production storage location in work scheduling view

D. Procurement type in MRP2 view

E. MRP type in MRP view

user-image
تم إضافة السؤال من قبل Sathish Prabhu.V , Manager - Operations & Process Improvement , Revolution Valves
تاريخ النشر: 2016/04/03
Bahiru Reshid
من قبل Bahiru Reshid , Government , National Electoral Board of Ethiopia

ACCORDING TO THE WORK PLAN AND PRIORITIZING A HIGH WEIGH JOBS

Wasi Rahman Sheikh
من قبل Wasi Rahman Sheikh , WAREHOUSE SUPERVISOR , AL MUTLAQ FURNITURE MFG

MRP type in work scheduling view

المزيد من الأسئلة المماثلة

هل تحتاج لمساعدة في كتابة سيرة ذاتية تحتوي على الكلمات الدلالية التي يبحث عنها أصحاب العمل؟