Quality control includes a number of activities and techniques within a project that ensure that the organization quality’s objective are being met.

Which of the following is not considered part of the quality control process.

A. quality audits.

B. continually monitoring process.

C. identifying and eliminating problem causes.

D. use of statistical process control to reduce process variability and increase effice

user-image
تم إضافة السؤال من قبل Muhammad Farooq , QA-QC MANAGER , AL Bawani contracting co.
تاريخ النشر: 2016/10/09
Mohamed Ezzdin
من قبل Mohamed Ezzdin , QHSE manager , Ostool Transport Co.

The answer is B) continually monitoring the process. Monitoring the process is one of the activities of quality assurance not quality control. In monitoring the process one approves the process not the deliverable of the process. And in Quality control we are concerned about the deliverable if it is accepted or not. 

Godwin Etim
من قبل Godwin Etim , Bernard Ojeifo Longe V First Bank of Nigeria Plc

D id the correct answer. Process variability is not part of the quality control process

Nadjib RABAHI
من قبل Nadjib RABAHI , Freelancer , My own account

The answer is : Option C-  Identifying and eliminating problem causes