ابدأ بالتواصل مع الأشخاص وتبادل معارفك المهنية

أنشئ حسابًا أو سجّل الدخول للانضمام إلى مجتمعك المهني.

متابعة

Work Breakdown Structures (WBS).

• Very important topic – you can surely expect some questions on WBS, WBS dictionary, and work packages. 

 

• Definition: WBS is a hierarchical decomposition of the total scope of work to be carried out by the project team to accomplish the project objectives and create the required deliverables. 

 

• The WBS is finalized by assigning each work package to a control account and establishing a unique identifier for that work package from a code of accounts. 

 

• These identifiers provide a structure for hierarchical summation of costs, schedule, and resource information. 

 

• Control accounts are placed at selected management points in the WBS. 

user-image
تم إضافة السؤال من قبل hassan shalaby , اخصائي تسويق ومبيعات، ومدرب مهارات معتمد من جامعة نوتنجهام بالمملكة المتحدة وجامعة عين شمس بالقاهرة , Galal Al , Sharif _Trading
تاريخ النشر: 2016/12/22

Thanks for the invitation. It is good info for any person looking to review PMBOK concepts and prepare for the PMP exam.

mamoun mokhtar
من قبل mamoun mokhtar , general manager , albyan technical foungary

Definition: WBS is a hierarchical decomposition of the total scope of work to be carried out by the project team to accomplish the project objectives and create the required deliverables. 

 

Sattar Abdulkarim  Mohamed
من قبل Sattar Abdulkarim Mohamed , Country Sales Director , Ideal Technical Solutions

Appreciation and thanks for your invitation. Good information about Work Breakdown Structures / WBS-Definition in the Project Management.

hisham abu dagga
من قبل hisham abu dagga , Project Manager / مدير مشاريع , مؤسسة عبدالكريم العواض للمقاولات

thanks for the information

With greetings and appreciation

Abdul Rehman
من قبل Abdul Rehman , Electrical Engineer , Tamdeed Projects

Thanks for the invitation. Very good explanation!

Muhammad Farooq
من قبل Muhammad Farooq , QA-QC MANAGER , AL Bawani contracting co.

Helpfull information regarding project management

هل تحتاج لمساعدة في كتابة سيرة ذاتية تحتوي على الكلمات الدلالية التي يبحث عنها أصحاب العمل؟