أنشئ حسابًا أو سجّل الدخول للانضمام إلى مجتمعك المهني.
A. A technique that uses sequential network logic for schedule development
B. A mathematical analysis technique for Develop Schedule
C. A technique that uses weighted averages to calculate project duration
D. A technique that allows for probabilistic treatment of both network logic and activity duration
estimates
I will go with option A & thanks for the invite.
In my opinion
A. A technique that uses sequential network logic for schedule development
D. A technique that allows for probabilistic treatment of both network logic and activity duration estimates
هل تحتاج لمساعدة في كتابة سيرة ذاتية تحتوي على الكلمات الدلالية التي يبحث عنها أصحاب العمل؟