A project's target date that has ample time enough for both design and construction stages, which stage you will extend?

a project that could be done in two years and you have three years to target date. are you going to increase design duration or construction duration. all this in the assumption that inflation is flat!

user-image
تم إضافة السؤال من قبل sami sharafuddin , Development Manager , Nakheel
تاريخ النشر: 2018/01/24
HARISH  Muddala
من قبل HARISH Muddala , Stewrding , QBG UAE

Yes it will enjoy because of it was afftetr a long planned

Saqlain Abbas
من قبل Saqlain Abbas

yes it will be enough because its choose after a long planning.

Aneesh Kamalasanan
من قبل Aneesh Kamalasanan , Draughtsman , Multiplex LLc.(Brookfield Multiplex)

I would increse design stage 

Amarpreet Sidhu
من قبل Amarpreet Sidhu , Chief Executive Officer CEO , Canaan Factories Limites

I would increase Design stage by 50% and construction stage by 25% and will like to complete the project early. 