What are the most important partial productivity metrics?

user-image
Question added by georgei assi , مدير حسابات , المجموعة السورية
Date Posted: 2014/12/20
Salah Othman Yousef Alshambaati
by Salah Othman Yousef Alshambaati , مدير ادارة الحسابات , شركة انفال الجديدة للتجارة والمقاولات

Agreed with the answer VENKITARAMAN KRISHNA MOORTHY VRINDAVAN

Vinod Jetley
by Vinod Jetley , Assistant General Manager , State Bank of India

Productivity measures that use one or more inputs or factors, but not all factors, are called partial productivities. A common example in economics is labor productivity, usually expressed as output per hour. At the company level, typical partial productivity measures are such things as worker hours, materials or energy per unit of production.

Divyesh Patel
by Divyesh Patel , Assistant Professional Officer- Treasury , City Of Cape Town

  1. Labor Productivity

  2. Total People Productivity

  3. Asset Productivity

  4. Capital Productivity

 

FARES AHMMED SHARF AL-AKHALI
by FARES AHMMED SHARF AL-AKHALI , محاسب قانوني معتمد , فارس الأكحلي محاسب قانوني معتمد

Im with mr. georgei for his answer...ok

georgei assi
by georgei assi , مدير حسابات , المجموعة السورية

Of the most productive partial metrics include:

  - Labor productivity: Chirely ratio between the output and the number of employees, working hours, number,

  - Productivity Material: Chirely ratio between the output and the materials used in production.

  - Productivity machines: Chirely and the relationship between the value of production and the number of hours of operation of machinery.

 

  - Capital productivity: Chirely relationship between the production value and the value of the invested capital.

VENKITARAMAN KRISHNA MOORTHY VRINDAVAN
by VENKITARAMAN KRISHNA MOORTHY VRINDAVAN , Project Execution Manager & Accounts Manager , ALI INTERNATIONAL TRADING EST.

Agreed with expert answers by Mr. Gerogei Assei and Mr. Vinod Jetley.. Productivity aims at optimum utilization of available Materials, Available labor, Machine Hours and also the Capital deployed to bring the production costs maximum under control and keep it minimum possible.

Mohammed Salim Allana
by Mohammed Salim Allana , Compliance and Assurance Manager , United Arab Bank

Agreed with all champs!

Alex Al Yazouri
by Alex Al Yazouri , General Manager , Al Mushref Cooperative Society

I echo with Mr. Assi on Labor, Material, Machines and Capital Productivity..