Start networking and exchanging professional insights

Register now or log in to join your professional community.

Follow

What is the amount of water cement ratio needed For complete hydration of cement?

user-image
Question added by Sagar Phatak
Date Posted: 2016/09/02
Mir Liyakat Farooq
by Mir Liyakat Farooq , Operations Manager , BYJUS

The range is 0.35-0.45. WC ratio can take any value from the range.

Imran Ahmed
by Imran Ahmed , Manager-Planning & Delay Analyst , Nesma United Industries (NUI) Saudi Arabia

For every kilogram of cement, about 0.42Kg of water is needed to fully complete hydration reactions.

However, a mix with a ratio of 0.42 may not mix thoroughly, and may not flow well enough to be placed. More water is therefore used than is technically necessary to react with cement. Water-cement ratios of 0.45 to 0.60 are more typically used. For higher-strength concrete, lower ratios are used, along with a plasticizer to increase flowability.

More Questions Like This

Do you need help in adding the right keywords to your CV? Let our CV writing experts help you.