Question added by Dana Adel Sales Representative Karmalite
6 years ago
Answers:
8
Followers:
Views:
18
Vote Count:
0
Answer should contain a minimum of 25 characters.
Mosab Badr's image  
Answer added by  Mosab Badr, Site Civil Engineer, EL AMANA for Construction"EL-Shrouk city"
5 years ago

Which may lead to the removal of some obstacles that may be interests of citizens, so design must take into account the interests of citizens

Mohammed  Wasim Uddin's image  
Answer added by  Mohammed Wasim Uddin, Qa/qc Civil Inspector, WSP International
5 years ago

  1-DESIGNING AS PER EXISTING STRUCTURE & UTILITIES 2-DESIGNING EXIT/ENTRY LOCATION  3-COST OF PROJECT 

Hamidreza Maghami's image  
Answer added by  Hamidreza Maghami, Project Manager, CVR Consulting Eng.
6 years ago

1- Design of the lines and stations, considering exsiting constructions & utilities 2- soil & water conditions 3- Allocating of area in urban 

sleem  orabi's image  
Answer added by  sleem orabi, Site Project Manager, Sarayya construction company
6 years ago

I think most imortant thing taking old foundation un considration. don`t cause traffic at any where saftey of people and houses

Sunnykumar Patel's image  
Answer added by  Sunnykumar Patel, Maintenance Manager, Prestige Group Nigeria
6 years ago

As per my knowledge, mobilization of ambulances, Life risk involvement, huge complex of engineering design and implimentation as analysis of drawing routin, and huge capi ... See More

Amer Abbas Shaker's image  
Answer added by  Amer Abbas Shaker, Site Manager (Owner Engineer), Renewable Resources (Pvt.) Limited (JV with Tractebel : Germany)
6 years ago

Following Problems will be faced... 1. Huge capital cost 2. Complex engineering designing 3. Big Disturbance for the people of city. like obstacles in transportations, el ... See More

hatem labib's image  
Answer added by  hatem labib, Quality control manager , MISER consultant
6 years ago

the main problems  how to determine the suitable path to avoid exisiting services and othe opstructions