Trending Overhaul Discussions

Follow

Ask the Community


Ask any professional question and get answers from other specialists.

Stream language
Hmeidan Gheith's image
Question added by Hmeidan Gheith mechanical inspector cementra
8 years ago
Answers:
5
Followers:
Views:
578
Vote Count:
0
Answer should contain a minimum of 25 characters.
Default profile image
Question added by Deleted user
8 years ago
Answers:
14
Followers:
Views:
5433
Vote Count:
0
Answer should contain a minimum of 25 characters.
walter Kidaha kisiavuki's image
Question added by walter Kidaha kisiavuki Mechanical Maintenance Supervisor Gulf Fluor LLC
9 years ago
Answers:
1
Followers:
Views:
136
Vote Count:
0
Answer should contain a minimum of 25 characters.
SATYAVIR  SINGH's image
Question added by SATYAVIR SINGH Principal Designer Structure Wood group
3 years ago

How p recasting RCC foundations, RCC slabs, colums and beams?‎

How installing all kinds of RCC structure ‎

Answers:
2
Followers:
Views:
1
Vote Count:
0
Answer should contain a minimum of 25 characters.
Default profile image
Question added by Abdulaziz Gaber Maintenance Planning Head Yemen LNG Company
6 years ago
Answers:
0
Followers:
Views:
1
Vote Count:
0
Answer should contain a minimum of 25 characters.
saeedullah soomro's image  
Answer added by  saeedullah soomro, Commercial Diver /Scientific Diver , Kaust university
1 year ago

All kinds of RCC structures and foundations are cast in the workshop open yards and need to follow up the design and detail drawings including the bar bending

Mark Daryll Abadies's image  
Answer added by  Mark Daryll Abadies, Engineering Supervisor, Rockwell Integrated Properties Services Inc.
7 years ago

That will depend on the Engine model

Vipin Vijayakumaran Nair's image  
Answer added by  Vipin Vijayakumaran Nair, Rig Mechanic, Gulf Drilling International
7 years ago

At 15000 hrs  top end overhauling and 45000 hrs major overhauling

thajudheen vadakkeputhenpurayil's image  
Answer added by  thajudheen vadakkeputhenpurayil, MECHANICAL MAINTENANCE ENGINEER, THAI TEAM
7 years ago

10-15 hours depends on size and sst and other tools availability

Berouk HAILU Habtemariam's image  
Answer added by  Berouk HAILU Habtemariam, Head facility Management, Tusdeer
7 years ago

if all required conditions are fulfilled it will take 20-30 hr.