Trending Site Surveys Discussions

Follow

Ask the Community


Ask any professional question and get answers from other specialists.

Stream language
Default profile image
Question added by Sikandar Hayat Mohsan Sr.Land Surveyor HBK Contracting Company W.L.L
8 years ago
Answers:
8
Followers:
Views:
1980
Vote Count:
0
Answer should contain a minimum of 25 characters.
Ahmed Ajjour's image
Question added by Ahmed Ajjour Civil Engineering Consultant unicef
10 years ago
Answers:
5
Followers:
Views:
143
Vote Count:
1
Answer should contain a minimum of 25 characters.
reyaskhan sainlapathy's image  
Answer added by  reyaskhan sainlapathy
8 years ago

we have to do traverse around the building area and establish proper bench marks with out any error using Bowditch rule..  simply set instrument on top of anywhere and us ... See More

Mohammed Salih Ibrahim's image  
Answer added by  Mohammed Salih Ibrahim, Sr.Land Surveyor (Open For New challenge), Directorate of Town Planning & Survey (DTPS)
8 years ago

20 floor is not that much high so try to use the method mentioned above with consideration the same control points (1st order) have to be used until the end of the projec ... See More

Sarfraz Ahmed's image  
Answer added by  Sarfraz Ahmed, Chief Land Surveyor, Nice Land Surveying
10 years ago

that really depends upon the nature of job you are going to do .. let say you are asked to make layout for building piles which should need to be done in  a specific tole ... See More

Mumtaz Ahmad's image  
Answer added by  Mumtaz Ahmad, surveying, al-alwan est
8 years ago

yes this reliable method  we use many time.

MOHAMMAD TARIQUE AZIZ's image  
Answer added by  MOHAMMAD TARIQUE AZIZ, STRUCTURAL DESIGN ENGINEER, Quality Austria Central Asia Pvt. Ltd.
8 years ago

 A  little less complicated, can be RESECTION on each floor using your Total Station, just be sure the Ground Control Points are VERY GOOD, this is maximum3 mm Residual d ... See More

Muhammad Rafiq's image  
Answer added by  Muhammad Rafiq, SURVEYOR, AL-RASHID COMPANY
9 years ago

1.      Total Station of  Leica TCR307 2.      Total Station of Sokkia Set610. 3.      Auto Focus Level of Sokkia       .   4.   Total station of Topcon gts751Total Stati ... See More

Ahmed Mohamed El Gameel Ahmed Aly El Menshawy's image  
Answer added by  Ahmed Mohamed El Gameel Ahmed Aly El Menshawy, Surveyor, Civil Land Consulting Office For Surveying and Engineering Services
9 years ago

well ... when you use level in Surveying the Road u going to plan , you aint forced to know how it gonna be , your job is simple & you just need to get levels of Righ ... See More