ابدأ بالتواصل مع الأشخاص وتبادل معارفك المهنية

أنشئ حسابًا أو سجّل الدخول للانضمام إلى مجتمعك المهني.

متابعة

Project scope differs from product scope in that:?

  1. Product scope completion is measured against the project management plan including all subsidiary plans.
  2. Project scope completion is measured against the features, functions, and product requirements.
  3. Project scope is the work that needs to be accomplished to deliver a product, service, or result.
  4. Product scope is the work that needs to be accomplished to deliver a product, service, or result.

user-image
تم إضافة السؤال من قبل Muhammad Hamid Munir PMP , Program Manager , Ericsson AB
تاريخ النشر: 2015/07/21
Ali Ahmed Abdurahman Al-kubati
من قبل Ali Ahmed Abdurahman Al-kubati , مدير المشتريات وادارة العقود في المشاريع ومساعد مدير المشروع , Ministry of Public Works and Highways

Project scope completion is measured against the features, functions, and product requirements.

Muhammad Haris
من قبل Muhammad Haris , Executive Assistant & Project Management Unit Officer , Riphah International University

Yes Product Scope is grater then project scope. Right Answer is 3.

Project scope is the work that needs to be accomplished to deliver a product,service or result

DR MD ANWAR HOSSAIN
من قبل DR MD ANWAR HOSSAIN , Moderator , bayt.com

I think Answer 3 is appropriate answer.

Md Fazlur Rahman
من قبل Md Fazlur Rahman , Procurement Specialist , Engineering and Planning Consultants Ltd

A project must deliver the the planned output. So, option 3 i.e. Project scope is the work that needs to be accomplished to deliver a product, service, or result.

المزيد من الأسئلة المماثلة

هل تحتاج لمساعدة في كتابة سيرة ذاتية تحتوي على الكلمات الدلالية التي يبحث عنها أصحاب العمل؟