Register now or log in to join your professional community.
Perform these 5 steps to calibrate a PT100:
1. Place the reference probe and the UUTs in the temperature source in close proximity to one another.
2. Connect the leads to the readout(s) ensuring proper 2-, 3-, or 4-wire connection.
3. Measure the reference probe and determine the temperature.
4. Measure and record the resistance of the UUT(s).
5. Fit the data.
Do you need help in adding the right keywords to your CV? Let our CV writing experts help you.