Start networking and exchanging professional insights

Register now or log in to join your professional community.

Follow

Does Conditioning Orifice Plate work when straight pipe run is only 4D totally (for upstream & downstream)?

user-image
Question added by yassin abbas , instrument and control engineer , Scot(Iraq petroleum Company For Oil Transport)
Date Posted: 2014/09/13
Riyas Sahab
by Riyas Sahab , INSIDE SALE ENGINEER , WIKA MIDDLE EAST

No, Conditioning orifice requires only shorter straight length compared to standard orifice. It works well even if the straight pipe run is more than4D total ( Upstream + Downstream). Minimum upstream length required for conditioning orifice is2D and minimum downstream length required for conditioning orifice is2D.

 

More Questions Like This

Do you need help in adding the right keywords to your CV? Let our CV writing experts help you.